|
Quality
Standards
The
Quality Systems implemented by Magneto Electric is based on
the dual Quality Management standard of CSA Z299.3 1985. Registered
and certified by the Quality Management Institute (QMI-SAI
GLOBAL) the national and internationally recognized Quality
Registrar. The Quality Systems consists of a Master Manual
with sub-manuals describing work procedures and equipment
operating manuals. Controlled manuals are issued to key personnel
throughout the company.
QUALITY
ASSURANCE ORGANIZATION AND RESPONSIBILITY
Quality Assurance is
the expressed responsibility of each manager and supervisor.
Managers and supervisors have the authority control non-conforming
items and initiate and verify measures to prevent recurrence.
DOCUMENTATION
All current documents
are individually marked with a reference and revision number
and are listed in the manual. Procedures exist which assure
that Quality related documents are prepared, reviewed, approved
and issued in a controlled manner.
INSPECTION,
MEASURE AND TEST EQUIPMENT
Procedures are established
to ensure registration and calibration of all electrical and
mechanical inspection and test equipment is performed by an
established laboratory with traceability to the National Recognized
Standards.
TEST
AND INSPECTION PLANS
The Quality Systems describes inspection and test plan activities
covering all aspects of test, inspections and verifications
for all services performed in repair work. Individual test
plans are also developed to meet specific requirements of
customers.
INSPECTION
AND TESTING
Procedures are established to ensure documentation and performance
of tests and inspections are completed in accordance with
test and inspection plans. These include: Incoming inspection
and test, In-process inspection and test and Final inspection
and test.
PROCUREMENT
The Quality Systems ensures that all purchasing activities
and carried out in a controlled manner and is applicable to
all products and services procured. A list of approved suppliers
is established based on the history of quality goods and services.
Where required by contract, purchases of material and subcontracted
services shall conform to Z299.3 equivalent.
INSPECTION
AND TEST STATUS
Inspection hold points are established on the test documents
for all stages of repair work with sign off when approved.
INDENTIFICATION
AND TRACEABILITY
All equipment for repair is identified through a central registry
(Motor Base Program TM) by job number and cross-referenced
by customer name. All equipment for repair is individually
tagged and appropriate test documentation attached upon receipt.
HANDLING,
STORAGE PACKING AND DELIVERY
Procedures are established to protect equipment during handling,
storage and delivery.
CONTRACT
AND TENDER
There are documented procedures established to provide systematic
review and analysis of customer inquiries and for the preparation
of bids and contracts. Quality Assurance is an integrated
part of these activities.
QUALITY
RECORDS
The Quality Systems describes the storage of quality records,
by whom and how long. CONTROL OF NON-CONFORMANCE Procedures
and documentation to cover non-conformance are established.
These procedures include identification of root cause, segregation
and disposition of non-conforming items.
CORRECTIVE
ACTION
These are procedures to identify and correct negative conditions
such as: mistakes, incorrect function, deficiencies etc. and
to prevent recurrence.
CUSTOMER
SUPPLIED ITEMS
Inspection of customer supplied items is a established procedure
to verify that such items are acceptable.
CUSTOMER COMPLIANTS
Customer complaints are documented and recorded and appropriate
actions are implemented to address the customer's concerns.
Follow up actions and customer feed back are also used to
ensure a satisfactory resolution.
QUALITY
AUDITS - INTERNAL AND EXTERNAL
Internal audits are carried out on a regular basis throughout
the year to ensure the effectiveness of the Quality Program.
These are augmented by Quality Management meetings. Compliance
audits are carried out annually by a certified auditor from
QMI SAI Global.
PROCESS
CONTROL
Procedures in the form of work instructions have been developed
and introduced in the workshop. These cover all applicable
electrical testing with additional generic manuals on motor
overhaul, spray metalizing of bearing journals & housings,
form coil armature rewind. AC stator rewind, VPI process (Vacuum
Pressure Impregnation) and varnish coating & cure of windings.
TRAINING
The Quality Systems ensures only competent personnel are engaged
in customer work. Any lack of proficiency is identified and
corrected by adequate training. All training of personnel
is recorded in the Master Manual.
|